Coppermine Photo Gallery

Your online photo album


m31-032-1mincr13inchf5.jpg
1 min Unguided 13"304 viewsUsed Tick Management
guideproblem.jpg
Guide Problem359 viewsUpper image is unguided and using Tick Management
The 5 min guided image should look the same.
The RA is in the direction of the elongated stars
Lower images are guided with and without Tick Management
While taking the lower images the traking error graph looked very similar in both images
m31-010x-30secfullcopr13inchf5.jpg
M32 10x30sec unguided341 viewsUsed tick management
m31-042-5mincr13inchf5.jpg
M32 5min unguided318 viewsUsed tick Management
newmount.jpg
New Mount Pic438 views--RA Gear: 16” (OpticCraft).
--DEC Gear: 13.5” (OpticCraft).
--Sidereal Technology Go-To System with wireless hand pad
--US Digital Encoders for motors
--High-resolution Gurley encoder on RA axis for precise tracking.
--Pittman servos, both axes
--2” Stainless Weight Shaft
--Pier with 360 degree pier rotation a
ngc-7331-refocus-00X-Xmin.jpg
NGC 7331 first guided image391 views8/25/2009 13" f4.7 @ f5.2
3x5min 5x5min
Sbig 11000
from my house with 1st quarter moon
notickpe72109.jpg
PE New Mount 7/21/2009379 viewsPE New Mount without Tick Management
tickpe72109.jpg
PE with Tick Management365 viewsNot true PE but what was measured (ignor cycles and total time the sceen shot was taken later)
girleyencRA.jpg
RA with Gurley Encoder for "Tick Management"510 viewsThis is not the standard “periodic error correction.” It is a real-time tracking correction for both periodic AND non-periodic errors. This approach is called “tick management”
m57comb9min.jpg
Tick Management on 9min389 viewsCombination of 30 sec 1 min and 2 min unguided pictures
Mount: New Mount
Camera: Sbig 11000
Teelscope: 8" at f6
   
10 files on 1 page(s)